Mandrel Data Sheets
The following data sheets provide details of the range and size of standard pigs provided by PE. We provide pigging tools for all pipe sizes. For further information or advice, contact our sales department at: sales@pipelineengineering.com.
Quick Jump to Datasheet
Mandrel Multi-Bolt Cup Data sheets

| Tool Designation: | 2CC |
|---|---|
| Nominal Size Range: | 14"ns to 36"ns |
| Operational Duties during a Pipelines Lifespan: | |
| Construction / Commissioning Phase | Cleaning / Dewatering / Filling |
| Operational Phase | Batching / Separation |
| Decommissioning Phase | Cleaning |
Click to Download Data Sheet for Tool Designation 2CC

| Tool Designation: | 2CC c/w Protector Nose |
|---|---|
| Nominal Size Range: | 14"ns to 36"ns |
| Operational Duties during a Pipelines Lifespan: | |
| Construction / Commissioning Phase | Cleaning / Dewatering / Filling |
| Operational Phase | Batching / Separation |
| Decommissioning Phase | Cleaning |
Click to Download Data Sheet for Tool Designation 2CC c/w Protector Nose

| Tool Designation: | 2SC |
|---|---|
| Nominal Size Range: | 6"ns to 36"ns |
| Operational Duties during a Pipelines Lifespan: | |
| Construction / Commissioning Phase | Cleaning / Dewatering / Filling |
| Operational Phase | Batching / Separation |
| Decommissioning Phase | Cleaning |
Click to Download Data Sheet for Tool Designation 2SC

| Tool Designation: | 2SC c/w Protector Nose |
|---|---|
| Nominal Size Range: | 62ns to 36"ns |
| Operational Duties during a Pipelines Lifespan: | |
| Construction / Commissioning Phase | Cleaning / Dewatering / Filling |
| Operational Phase | Batching / Separation |
| Decommissioning Phase | Cleaning |
Click to Download Data Sheet for Tool Designation 2SC c/w Protector Nose

| Tool Designation: | 3CC |
|---|---|
| Nominal Size Range: | 14"ns to 36"ns |
| Operational Duties during a Pipelines Lifespan: | |
| Construction / Commissioning Phase | Cleaning / Dewatering / Filling |
| Operational Phase | Batching / Separation |
| Decommissioning Phase | Cleaning |
Click to Download Data Sheet for Tool Designation 3CC

| Tool Designation: | 3CC c/w Protector Nose |
|---|---|
| Nominal Size Range: | 14"ns to 36"ns |
| Operational Duties during a Pipelines Lifespan: | |
| Construction / Commissioning Phase | Cleaning / Dewatering / Filling |
| Operational Phase | Batching / Separation |
| Decommissioning Phase | Cleaning |
Click to Download Data Sheet for Tool Designation 3CC c/w Protector Nose

| Tool Designation: | 3SC |
|---|---|
| Nominal Size Range: | 6"ns to 36"ns |
| Operational Duties during a Pipelines Lifespan: | |
| Construction / Commissioning Phase | Cleaning / Dewatering / Filling |
| Operational Phase | Batching / Separation |
| Decommissioning Phase | Cleaning |
Click to Download Data Sheet for Tool Designation 3SC

| Tool Designation: | 3SC c/w Protector Nose |
|---|---|
| Nominal Size Range: | 6"ns to 36"ns |
| Operational Duties during a Pipelines Lifespan: | |
| Construction / Commissioning Phase | Cleaning / Dewatering / Filling |
| Operational Phase | Batching / Separation |
| Decommissioning Phase | Cleaning |
Click to Download Data Sheet for Tool Designation 3SC c/w Protector Nose

| Tool Designation: | 4CC |
|---|---|
| Nominal Size Range: | 14"ns to 36"ns |
| Operational Duties during a Pipelines Lifespan: | |
| Construction / Commissioning Phase | Cleaning / Dewatering / Filling |
| Operational Phase | Batching / Separation |
| Decommissioning Phase | Cleaning |
Click to Download Data Sheet for Tool Designation 4CC

| Tool Designation: | 4CC c/w Protector Nose |
|---|---|
| Nominal Size Range: | 14"ns to 36"ns |
| Operational Duties during a Pipelines Lifespan: | |
| Construction / Commissioning Phase | Cleaning / Dewatering / Filling |
| Operational Phase | Batching / Separation |
| Decommissioning Phase | Cleaning |
Click to Download Data Sheet for Tool Designation 4CC c/w Protector Nose

| Tool Designation: | 4SC |
|---|---|
| Nominal Size Range: | 6"ns to 36"ns |
| Operational Duties during a Pipelines Lifespan: | |
| Construction / Commissioning Phase | Cleaning / Dewatering / Filling |
| Operational Phase | Batching / Separation |
| Decommissioning Phase | Cleaning |
Click to Download Data Sheet for Tool Designation 4SC

| Tool Designation: | 4SC c/w Protector Nose |
|---|---|
| Nominal Size Range: | 6"ns to 36"ns |
| Operational Duties during a Pipelines Lifespan: | |
| Construction / Commissioning Phase | Cleaning / Dewatering / Filling |
| Operational Phase | Batching / Separation |
| Decommissioning Phase | Cleaning |
Click to Download Data Sheet for Tool Designation 4SC c/w Protector Nose
Mandrel Multi-Bolt Disc Data sheets

| Tool Designation: | 2-2D |
|---|---|
| Nominal Size Range: | 6"ns to 36"ns |
| Operational Duties during a Pipelines Lifespan: | |
| Construction / Commissioning Phase | Cleaning / Dewatering / Filling |
| Operational Phase | Batching / Separation |
| Decommissioning Phase | Cleaning |
Click to Download Data Sheet for Tool Designation 2-2D

| Tool Designation: | 2-2D c/w Protector Noses |
|---|---|
| Nominal Size Range: | 6"ns to 36"ns |
| Operational Duties during a Pipelines Lifespan: | |
| Construction / Commissioning Phase | Cleaning / Dewatering / Filling |
| Operational Phase | Batching / Separation |
| Decommissioning Phase | Cleaning |
Click to Download Data Sheet for Tool Designation 2-2D c/w Protector Noses

| Tool Designation: | 2-4D |
|---|---|
| Nominal Size Range: | 6"ns to 36"ns |
| Operational Duties during a Pipelines Lifespan: | |
| Construction / Commissioning Phase | Cleaning / Dewatering / Filling |
| Operational Phase | Batching / Separation |
| Decommissioning Phase | Cleaning |
Click to Download Data Sheet for Tool Designation 2-4D

| Tool Designation: | 2-4D c/w Protector Noses |
|---|---|
| Nominal Size Range: | 6"ns to 36"ns |
| Operational Duties during a Pipelines Lifespan: | |
| Construction / Commissioning Phase | Cleaning / Dewatering / Filling |
| Operational Phase | Batching / Separation |
| Decommissioning Phase | Cleaning |
Click to Download Data Sheet for Tool Designation 2-4D c/w Protector Noses

| Tool Designation: | 2-6D |
|---|---|
| Nominal Size Range: | 6"ns to 36"ns |
| Operational Duties during a Pipelines Lifespan: | |
| Construction / Commissioning Phase | Cleaning / Dewatering / Filling |
| Operational Phase | Batching / Separation |
| Decommissioning Phase | Cleaning |
Click to Download Data Sheet for Tool Designation 2-6D

| Tool Designation: | 2-6D c/w Protector Noses |
|---|---|
| Nominal Size Range: | 6"ns to 36"ns |
| Operational Duties during a Pipelines Lifespan: | |
| Construction / Commissioning Phase | Cleaning / Dewatering / Filling |
| Operational Phase | Batching / Separation |
| Decommissioning Phase | Cleaning |
Click to Download Data Sheet for Tool Designation 2-6D c/w Protector Noses

| Tool Designation: | 2B2D |
|---|---|
| Nominal Size Range: | 6"ns to 36"ns |
| Operational Duties during a Pipelines Lifespan: | |
| Construction / Commissioning Phase | Cleaning |
| Operational Phase | Cleaning |
| Decommissioning Phase | Cleaning |
Click to Download Data Sheet for Tool Designation 2B2D

| Tool Designation: | 2B2D c/w Protector Noses |
|---|---|
| Nominal Size Range: | 6"ns to 36"ns |
| Operational Duties during a Pipelines Lifespan: | |
| Construction / Commissioning Phase | Cleaning |
| Operational Phase | Cleaning |
| Decommissioning Phase | Cleaning |
Click to Download Data Sheet for Tool Designation 2B2D c/w Protector Noses

| Tool Designation: | 2B4D |
|---|---|
| Nominal Size Range: | 6"ns to 36"ns |
| Operational Duties during a Pipelines Lifespan: | |
| Construction / Commissioning Phase | Cleaning |
| Operational Phase | Cleaning |
| Decommissioning Phase | Cleaning |
Click to Download Data Sheet for Tool Designation 2B4D

| Tool Designation: | 2B4D c/w Protector Noses |
|---|---|
| Nominal Size Range: | 6"ns to 36"ns |
| Operational Duties during a Pipelines Lifespan: | |
| Construction / Commissioning Phase | Cleaning |
| Operational Phase | Cleaning |
| Decommissioning Phase | Cleaning |
Click to Download Data Sheet for Tool Designation 2B4D c/w Protector Noses
| Tool Designation: | 2B6D |
|---|---|
| Nominal Size Range: | 6"ns to 36"ns |
| Operational Duties during a Pipelines Lifespan: | |
| Construction / Commissioning Phase | Cleaning |
| Operational Phase | Cleaning |
| Decommissioning Phase | Cleaning |
Click to Download Data Sheet for Tool Designation 2B6D

| Tool Designation: | 2B6D c/w Protector Noses |
|---|---|
| Nominal Size Range: | 6"ns to 36"ns |
| Operational Duties during a Pipelines Lifespan: | |
| Construction / Commissioning Phase | Cleaning |
| Operational Phase | Cleaning |
| Decommissioning Phase | Cleaning |
Click to Download Data Sheet for Tool Designation 2B6D c/w Protector Noses

| Tool Designation: | 2D |
|---|---|
| Nominal Size Range: | 6"ns to 36"ns |
| Operational Duties during a Pipelines Lifespan: | |
| Construction / Commissioning Phase | Cleaning / Dewatering / Filling |
| Operational Phase | Batching / Separation |
| Decommissioning Phase | Cleaning |
Click to Download Data Sheet for Tool Designation 2D

| Tool Designation: | 2D c/w Protector Noses |
|---|---|
| Nominal Size Range: | 6"ns to 36"ns |
| Operational Duties during a Pipelines Lifespan: | |
| Construction / Commissioning Phase | Cleaning / Dewatering / Filling |
| Operational Phase | Batching / Separation |
| Decommissioning Phase | Cleaning |
Click to Download Data Sheet for Tool Designation 2D c/w Protector Noses

| Tool Designation: | 3D |
|---|---|
| Nominal Size Range: | 6 |
| Operational Duties during a Pipelines Lifespan: | |
| Construction / Commissioning Phase | Cleaning / Dewatering / Filling |
| Operational Phase | Batching / Separation |
| Decommissioning Phase | Cleaning |
Click to Download Data Sheet for Tool Designation 3D

| Tool Designation: | 3D c/w Protector Noses |
|---|---|
| Nominal Size Range: | 6"ns to 36"ns |
| Operational Duties during a Pipelines Lifespan: | |
| Construction / Commissioning Phase | Cleaning / Dewatering / Filling |
| Operational Phase | Batching / Separation |
| Decommissioning Phase | Cleaning |
Click to Download Data Sheet for Tool Designation 3D c/w Protector Noses

| Tool Designation: | 4-4D |
|---|---|
| Nominal Size Range: | 6"ns to 36"ns |
| Operational Duties during a Pipelines Lifespan: | |
| Construction / Commissioning Phase | Cleaning / Dewatering / Filling |
| Operational Phase | Batching / Separation |
| Decommissioning Phase | Cleaning |
Click to Download Data Sheet for Tool Designation 4-4D

| Tool Designation: | 4-4D c/w Protector Noses |
|---|---|
| Nominal Size Range: | 6"ns to 36"ns |
| Operational Duties during a Pipelines Lifespan: | |
| Construction / Commissioning Phase | Cleaning / Dewatering / Filling |
| Operational Phase | Batching / Separation |
| Decommissioning Phase | Cleaning |
Click to Download Data Sheet for Tool Designation 4-4D c/w Protector Noses

| Tool Designation: | 4D |
|---|---|
| Nominal Size Range: | 6"ns to 36"ns |
| Operational Duties during a Pipelines Lifespan: | |
| Construction / Commissioning Phase | Cleaning / Dewatering / Filling |
| Operational Phase | Batching / Separation |
| Decommissioning Phase | Cleaning |
Click to Download Data Sheet for Tool Designation 4D

| Tool Designation: | 4D c/w Protector Noses |
|---|---|
| Nominal Size Range: | 6"ns to 36"ns |
| Operational Duties during a Pipelines Lifespan: | |
| Construction / Commissioning Phase | Cleaning / Dewatering / Filling |
| Operational Phase | Batching / Separation |
| Decommissioning Phase | Cleaning |
Click to Download Data Sheet for Tool Designation 4D c/w Protector Noses
Other Data sheets Available
Pipeline Engineering offer the following downloadable data sheets about our products. Click on one of the options below to see a list of downloadable data sheets for that category.
Pipeline Engineering, Gatherley Road, Catterick Bridge, Richmond, North Yorkshire, DL10 7JQ
- Tel: +44 (0) 1748 813 000
- Fax: +44 (0) 1748 813 501